Germany 161 m² SAC Automotive Components Cleanroom

Completed in Germany in 2024, this 161 m² SAC cleanroom provides an ISO 7 environment for automotive component operations.

Completed in Germany in 2024, this 161 m² project provided an ISO 7 clean environment for automotive component operations. The client required the clean space to fit an overseas site and its equipment layout, so the enclosure had to be coordinated with the building conditions rather than treated as a standalone box. The SAC modular cleanroom was assembled on site using a wall-and-ceiling package. Its scope also covered HVAC and filtration, lighting, electrical systems, automation, monitoring, commissioning, and validation. In this form of cleanroom construction, each cleanroom partition wall helps define the controlled area while service connections are planned around the operational footprint. The recorded delivery period was two months. The case demonstrates the use of a compact, site-assembled solution for an industrial application outside pharmaceuticals. It does not disclose the manufacturer, equipment specifications, or measured production outcomes.

Germany 161 m² SAC Automotive Components Cleanroom
161 m² المساحة الخاضعة للتحكم
2 months التسليم
ISO 7 تصنيف الغرفة النظيفة
01
التحدي

التعامل مع قيود المشروع الواقعية

Provide approximately 161 m² of ISO 7 clean space for automotive component operations and adapt it to the overseas site and equipment layout.

02
الحل

هندسة مصممة للعملية

A site-assembled SAC modular cleanroom provided 161 m² of ISO 7 space for automotive component operations in Germany.

نطاق التوريد

حزمة غرفة نظيفة متكاملة

تم تنسيق حزمة المشروع كنظام متكامل، مع مواءمة الواجهات المعمارية والميكانيكية وأنظمة التحكم من التصميم حتى التأهيل.

  • 01Site-assembled modular walls and ceiling for a 161 m² automotive components cleanroom
  • 02HVAC and filtration serving the ISO 7 clean space
  • 03Lighting, electrical, automation and monitoring systems
  • 04On-site assembly, commissioning and validation