Malaysia 30 m² SAC Electronics Cleanroom

Completed in Malaysia in 2023, this 30 m² SAC cleanroom targets ISO 8 for electronic component operations.

Delivered in Malaysia in 2023, this 30 m² SAC project served electronic component operations that required an ISO 8 clean environment. The small area called for a practical site-assembled layout that could fit the client's operating space. The modular cleanroom package included walls and cleanroom ceiling panels, supported by HVAC and filtration, lighting, electrical services, automation, and monitoring. On-site cleanroom installation was followed by commissioning and validation within the project scope. By treating the enclosure and environmental services as a coordinated package, the project addressed the interfaces that are easy to overlook in a compact room. The recorded lead time was one month. This case provides an example of SAC delivery for electronics manufacturing where a targeted controlled area is needed, rather than a large cleanroom facility. The public summary intentionally leaves out the client's name, equipment arrangement, and any process performance data not documented in the source material.

Malaysia 30 m² SAC Electronics Cleanroom
30 m² المساحة الخاضعة للتحكم
1 month التسليم
ISO 8 تصنيف الغرفة النظيفة
01
التحدي

التعامل مع قيود المشروع الواقعية

Provide approximately 30 m² of ISO 8 clean space for electronic component operations with a compact site-assembled layout.

02
الحل

هندسة مصممة للعملية

A compact site-assembled SAC modular cleanroom provided 30 m² of ISO 8 space for electronic component operations in Malaysia.

نطاق التوريد

حزمة غرفة نظيفة متكاملة

تم تنسيق حزمة المشروع كنظام متكامل، مع مواءمة الواجهات المعمارية والميكانيكية وأنظمة التحكم من التصميم حتى التأهيل.

  • 01Site-assembled modular walls and ceiling for a 30 m² electronics cleanroom
  • 02HVAC and filtration serving the ISO 8 clean space
  • 03Lighting, electrical, automation and monitoring systems
  • 04On-site assembly, commissioning and validation