توريد الغرف النظيفة حول العالم
الرئيسية / الحلول / SAC · دراسة حالة
SAC · دراسة حالة

Changchun 130 m² SAC Injection Molding Cleanroom

Completed in Changchun, China, in 2025, this 130 m² SAC cleanroom provides ISO 7 and ISO 8 controlled areas for injection molding operations.

Completed in Changchun, China, in 2025, this 130 m² SAC project created controlled space for injection molding operations. The brief included ISO 7 and ISO 8 areas, requiring the enclosure and environmental systems to support two cleanliness zones within a compact industrial layout. A modular cleanroom was assembled on site using cleanroom wall panels and cleanroom ceiling systems coordinated with the equipment arrangement. The delivery package also included HVAC and filtration for the classified zones, lighting, electrical services, automation, and monitoring. On-site assembly was followed by commissioning and validation during the three-month delivery period. This case illustrates how SAC can adapt to an injection molding facility where room boundaries and service connections must follow the production layout. The client is identified only by its internal project name in the source record, while the public case title remains anonymized. No additional process or performance claims are made.

Changchun 130 m² SAC Injection Molding Cleanroom
130 m² المساحة الخاضعة للتحكم
3 months التسليم
ISO 7 / ISO 8 تصنيف الغرفة النظيفة
01
التحدي

التعامل مع قيود المشروع الواقعية

Create approximately 130 m² of controlled space for injection molding, with ISO 7 and ISO 8 zoning coordinated around the site and equipment layout.

02
الحل

هندسة مصممة للعملية

A site-assembled SAC modular cleanroom provided approximately 130 m² of ISO 7 and ISO 8 space for injection molding operations in Changchun.

نطاق التوريد

حزمة غرفة نظيفة متكاملة

تم تنسيق حزمة المشروع كنظام متكامل، مع مواءمة الواجهات المعمارية والميكانيكية وأنظمة التحكم من التصميم حتى التأهيل.

  • 01Site-assembled modular walls and ceiling for a 130 m² injection molding cleanroom
  • 02HVAC and filtration serving the ISO 7 and ISO 8 clean zones
  • 03Lighting, electrical, automation and monitoring systems
  • 04On-site assembly, commissioning and validation
ابدأ مشروعك

هل تخطط لغرفة نظيفة مماثلة؟

شاركنا متطلبات العملية والتصنيف والجدول الزمني. سيوصي فريقنا بنهج PAC أو SAC الأنسب.