Shanghai 240 m² PAC Modular Biopharmaceutical Laboratory

Completed in Shanghai in 2026, this 240 m² PAC modular laboratory provides an ISO 8 environment for biopharmaceutical applications.

Completed in Shanghai in 2026, this project supplied approximately 240 m² of ISO 8 laboratory space for biopharmaceutical use. The brief specified a PAC format suitable for factory pre-assembly, transport, and connection at the destination. Wonclean supplied pre-assembled modular laboratory units rather than building the full enclosure room by room at the site. The scope covered modular walls and cleanroom ceiling panels, HVAC and filtration, lighting, electrical systems, automation, monitoring, module installation, commissioning, and validation. The prefabricated laboratory approach brought several coordinated elements together before shipment while leaving final site interfaces to be completed after delivery. Its recorded lead time was three months. At 240 m², this case is larger than a single small research pod and shows how PAC can be applied to a more substantial laboratory requirement. The available public data does not describe the research process or equipment list.

Shanghai 240 m² PAC Modular Biopharmaceutical Laboratory
240 m² المساحة الخاضعة للتحكم
3 months التسليم
ISO 8 تصنيف الغرفة النظيفة
01
التحدي

التعامل مع قيود المشروع الواقعية

Create approximately 240 m² of ISO 8 modular laboratory space suitable for factory pre-assembly, transport and site connection.

02
الحل

هندسة مصممة للعملية

Pre-assembled PAC laboratory modules provided approximately 240 m² of ISO 8 space for biopharmaceutical use in Shanghai.

نطاق التوريد

حزمة غرفة نظيفة متكاملة

تم تنسيق حزمة المشروع كنظام متكامل، مع مواءمة الواجهات المعمارية والميكانيكية وأنظمة التحكم من التصميم حتى التأهيل.

  • 01Pre-assembled modular walls and ceiling for a 240 m² biopharmaceutical modular laboratory
  • 02HVAC and filtration serving the ISO 8 clean space
  • 03Lighting, electrical, automation and monitoring systems
  • 04On-site module installation, commissioning and validation