Completed in Malaysia in 2024, this 126 m² PAC project provided an ISO 8 environment for biopharmaceutical operations. The client required clean space that could be prepared as modules and installed quickly after delivery. A prefabricated cleanroom configuration was chosen, with the walls, ceiling, HVAC, filtration, lighting, electrical services, automation, and monitoring coordinated as one package. The cleanroom wall panels formed part of the pre-assembled enclosure, while module installation, commissioning, and validation completed the site scope. The recorded lead time was two months. This modular cleanroom example shows how PAC delivery can suit a mid-sized controlled area where transport and on-site connections can be planned in advance. The published case does not identify the client or give process-specific equipment details. It also does not claim measured performance beyond the ISO 8 classification stated in the project information.
Create approximately 126 m² of ISO 8 biopharmaceutical clean space with pre-assembled modular delivery and rapid site installation.
Pre-assembled PAC cleanroom modules provided 126 m² of ISO 8 space for biopharmaceutical use in Malaysia.
تم تنسيق حزمة المشروع كنظام متكامل، مع مواءمة الواجهات المعمارية والميكانيكية وأنظمة التحكم من التصميم حتى التأهيل.
شاركنا متطلبات العملية والتصنيف والجدول الزمني. سيوصي فريقنا بنهج PAC أو SAC الأنسب.