Iraq 28 m² Containerized Crude Oil Laboratory

Delivered to Iraq in 2025, this 28 m² PAC laboratory integrates crude oil testing functions within a 40-foot container.

This project delivered a 28 m² crude oil testing workspace to Iraq in 2025 within a 40-foot container. The client needed laboratory functions integrated into a transportable enclosure for international shipment and rapid deployment. A PAC containerized laboratory format brought the enclosure and core services together before site installation. The scope included the container structure and ceiling, laboratory HVAC and filtration, lighting, electrical systems, automation, monitoring, commissioning, and validation. Unlike the other cases in this portfolio, no cleanroom classification was specified for this project, so none is claimed here. The recorded delivery period was one month. This shipping container laboratory illustrates how a modular laboratory can provide a defined testing workspace where a conventional building extension may be impractical. The public information does not specify the test methods, instruments, hazardous-area rating, or utility capacities; those details would require separate project documentation.

Iraq 28 m² Containerized Crude Oil Laboratory
28 m² المساحة الخاضعة للتحكم
1 month التسليم
No requirement تصنيف الغرفة النظيفة
01
التحدي

التعامل مع قيود المشروع الواقعية

Integrate crude oil laboratory functions within a 40-foot container for international transport and rapid site deployment.

02
الحل

هندسة مصممة للعملية

A pre-assembled 40-foot PAC container laboratory integrated a 28 m² crude oil testing workspace for deployment in Iraq.

نطاق التوريد

حزمة غرفة نظيفة متكاملة

تم تنسيق حزمة المشروع كنظام متكامل، مع مواءمة الواجهات المعمارية والميكانيكية وأنظمة التحكم من التصميم حتى التأهيل.

  • 0140-foot container enclosure and ceiling for a 28 m² crude oil testing laboratory
  • 02Laboratory HVAC and filtration systems
  • 03Lighting, electrical, automation and monitoring systems
  • 04On-site installation, commissioning and validation